What is the typical cost advantage of using SunPower Performance panels?
Costs vary from project to project. Performance panels generally have a price point that is competitive with Conventional Panels.
What is the typical performance advantage gained from using SunPower Performance panels?
We built the Performance solar panels for high reliability, high efficiency and low degradation—driving an estimated 8% more energy yield in a fixed space over the first 30 years of operation when compared to Conventional mono PERC Panels1.
How is the system managed in three-phase? How are imbalances managed?
The Enphase three-phase Q Cable allows balanced and automated power management of each phase. Alternatively, when using three single-phase cables, care must be taken to balance the phases by installing a similar number of panels on each phase.
The Envoy-S communications gateway can also provide phase imbalance monitoring to ensure authorised limits are not exceeded. The Envoy is able to manage PV power production at the microinverter level to maintain balance within set limits.
How many microinverters can you put on a single-phase installation? And a three-phase installation?
In single-phase, 10 microinverters can be connected. In a three-phase installation, up to 30 microinverters can be connected on a single 20A three phase circuit breaker. Larger systems can be constructed with multiple AC branch circuits.
In a three-phase installation of 230V between phases, can these modules and microinverters be installed without additional transformers? What accessories need to be included in the installation?
Yes, AC modules can be installed on Delta grid arrangement with 230V between phases. No additional transformer equipment is required for typical LV connections. Alongside the microinverters that are supplied as part of the PV module, installers will need to purchase Q cables, cable accessories and the Envoy-S communications gateway. Contact your Sales Manager to access additional installer tools to learn more about site design and balance of system requirements. In addition to the AC module, what additional components are needed to complete the installation? In addition to the AC module, installers will need to purchase Q cables, cable accessories, and the Envoy-S communications gateway. Contact your Sales Manager to access additional installer tools to learn more about site design and balance of system requirements.
Is the AC module compliant with RD 244 for zero injection? Can it be used for isolated installations?
No, export limiting functionality is not yet compliant with RD 244/2019. Most installations with Enphase microinverters are residential scale (below 15kW) and are easily accepted without this compliance.
Each microinverter is a single phase device. Three-phase installations are constructed with single phase microinverters distributed across the phases. The inverter will monitor power consumption at each phase using the CTs connected to the Envoy-S communications gateway, limiting grid export to the defined level, either on a per phase or aggregate basis as required.In three-phase installations, can you divide surpluses by phases?